Slide
Foryd Harbour Bridge

AM Structures were approached in 2009 by Dawnus Ltd to design and build two mirroring decks. By 2011 the design had changed and the entire structure was to be fabricated from FRP/CFRP; Foryd harbour bridge was opened to the public in October 2013 on time and in budget.

previous arrow
next arrow

Bridges